Reconstruction of the 110 kV outdoor switchyard at Kresna 110/20 kV substation
Reconstruction of the 110 kV outdoor switchyard at Kresna 110/20 kV substation
WORK PERFORMED:
Reconstruction of the 110 kV outdoor switchyard (conversion of the 110 kV switchyard to a full “H” scheme), in accordance with Annex No. 1.1 – “Single-line diagram of the 110 kV switchyard after reconstruction”;
Reconstruction of the existing 110 kV outgoing lines – “Granit” to Simitli substation and “Orbel” to Sandanski substation;
Reconstruction of the two existing 110 kV transformer bays;
Replacement of all existing equipment – disconnectors, circuit breakers, instrument transformers, etc. – with new units;
Construction of steel gantry structures, equipment supports, tubular busbars, cable trenches and site grading;
Construction of internal roads and access roads;
Construction of oil-collecting drainage and an oil-collecting pit;
Secondary wiring, earthing and lightning-protection installations;
Installation of working, emergency and security lighting.