Reconstruction of the 110 kV outdoor switchyard at Valchedram 110/20 kV substation
Reconstruction of the 110 kV outdoor switchyard at Valchedram 110/20 kV substation
WORK PERFORMED:
Construction of new steel gantry structures, equipment supports, tubular busbars and cable trenches
Replacement of all existing equipment – disconnectors, circuit breakers, instrument transformers, etc. – with new units
Construction of foundations and bunds for the power transformers;
Construction of internal roads and access roads, oil-collecting drainage
Site grading and construction of internal roads and approaches
Secondary wiring, earthing and lightning-protection installations
Installation of working, emergency and security lighting
Other works in accordance with the design solutions.